Traitement de l eau et traitement de l eau: South Africa appels d'offres, marchés publics 2024




S'inscrire

Partager:
total: 238
10 sep
Quotations are hereby invited for the provision of wellness programme for Magalies Water a fixed period of three years. Magalies Water is seeking to appoint a suitably qualified service provider who will assist with Employee Wellness Programme services to all Magalies Water employees and their immediate families. Scope of Work: - Chronic Illness management which includes, among others; awareness, counseling, testing and support for employees and their immediate family members. Assistance with the potential impact of HIV & AIDS, Cancer etc through interventions and programmes that are appropriate, cost effective and sustainable; - Executive Wellness; - Awareness and Education interventions; - Health and Fitness; - Psychological and clinical counseling; - Stress and Trauma management; - Substance abuse and addiction; - Support for chronic illness; - Call centre help line and face-to-face or on/off-site consultation; - Detailed Service Management Plan (timelines and resources to be utilized); - Utilization Reports (reports to Magalies Water on a quarterly basis); - Provision of health awareness services; - Advisory services to Magalies Water on Employee Assistance Programmes (EAP) relating to performance and disability management; - Provision of health and wellness advisory services and referral to external health resources nutrition, medical treatment and opinion; - Case management and monitoring. Time Frame: Three (3) years. Please confirm the closing time as it was not published. (EN) Ajouter aux favoris
Client: ONLINE TENDERS

Nombre: 110628623

Country: South Africa

Source: ONLINE TENDERS

08 aug
Quotations are hereby invited from service providers to supply and install fan coil units and split air-conditioning units. Scope of work 1: Supply and install 6 off fan coil units: Supply and installation of 6 off chilled water fan coil units together with independent powered supplied in-line condensate pumps for 4 off the units in the DMTP office areas: 1. Size and location of fan and coils to be replaced: a. SCADA Room, SAAMBR Technical Workshop: - Input Power = 2870W, - Rated Current = 13A, - Cooling/Heating Capacity = 27 000Btu/h, - EER = 9.4 Btu/v h, - Air Volume = 1900 CFM, b. Ori-lab, SAAMBR: - Input (V/Phase/Hz) = 220-240V/1/50, - Rated Current = 66/0.29 (W) (Amp), - Cooling/Heating Capacity = 4.54/15500 KW/Btu/h, - Air Volume = 1070 CFM, c. Lab 50,Office 27, Office 40 and Office 42 - SAAMBR: - 4 x 3.84 KW Fan and Coil Units, d. All Fan and coils units are to be installed with Independent/dedicated powered supplied in-line condensate pumps, e. New Control and isolation Valves are to be installed for all Fan and Coils Units, 2. General scope of works: • De-commission and remove old units, • Disconnect the electrical supply and make safe, • Supply and installation of new fan and coil unit, • Make good on all building work, new piping and insulation, lagging to be done on chilled water pipes. All building work is the responsibility of the contractor, • All areas that work is carried out in, area must be left clean, and all openings are closed, • All work carried out in areas where there is the presence of animals, arrangements must be made before work commences in that specific area, • All work carried out with the least amount of disturbance to the guests, staff and animals, • All condenser coils must be blue-chem treated (Sea shore treatment) for all indoor and outdoor units, • Ensure ceilings boards are cleaned and replaced correctly, • All piping and Cabling to be ducted or installed inside conjugates boxes / piping and cabling should not be visible. Scope of work 2: Supply and install Split Air Conditioning Units: General scope of works: • De-commission and remove old units, remove Armaflex and remove old copper tubing, • Disconnect the electrical supply and make safe, • Supply and installation of new split type air conditioning units using for R410A gas, • Make good on all building work, new piping and insulation. All building work is the responsibility of the contractor, • All areas that work is carried out in, area must be left clean, and all openings are closed, • All work carried out in areas where there is the presence of animals, arrangements must be made before work commences in that specific area, • All work carried out with the least amount of disturbance to the guests, staff and animals, • All piping and Cabling to be ducted or installed inside conjugates boxes / piping and cabling should not be visible, • All condenser coils must be blue-chem treated (Sea shore treatment) for all outdoor units - Blue Chem Certification must be supplied for each unit and each unit to be labeled accordingly, • Where new power supplies are required, it is the responsibility of the service provider to install the cabling, isolator switches and to do all connections to the relevant DB’s, • 3 AC’s require condensate pumps with piping for the pumping out of the condensate. Size and location of split air conditioning units required: 1. 9 000 btu’s, qty: 6, location: - Parking B, - Parking A x 3, - Mitchelle’s office, - Dolphin ticketing – replace window wall with a split aircon, 2. 12 000 btu’s, qty: 11, location: - Quarantine Lab office, - Ticketing (Supervisor’s office), - Ticketing (Server Room), - Ticketing (Wet ‘n Wild), - Water Quality Lab (includes Condensate Pump & Piping), - Clinic (includes Condensate Pump and Piping), - Dolphin Lookout - ticketing, - Procurement Buyers’ office x2, one, replace window wall with a split aircon and cover whole, - Atlas plantroom, - Dolphin technical room, 3. 18 000 btu’s, qty: 5, location: - Dolphins office x 2, - Microbiology Lab (includes Condensate Pump & Piping), - Quarantine Lab, - SAAMBR Technical rest room, 4. 36 000 btu, qty: 1, location: Curatorial Food Prep, 5. 24000 btu, qty: 1, location: Ori Lab office. (EN) Ajouter aux favoris
Client: ONLINE TENDERS

Nombre: 108825154

Country: South Africa

Source: ONLINE TENDERS